(Cycles thru suppliers)


Letter 20042

Hydrogen embrittlement suspicion  

+++

Piston rod of 1045 steel d=18 mm, l=30 cm should follow the sequences as below:

1-first grinding
2-surface induction hardening depth=1mm
3-cracks detection
4-tempering microhardness at this stage 450 HV (300 gr load)at o.6-1.0 mm depth area.
5-grinding
6- hard chromium micro cracked type 25 micron.
7-last buffing 5 micron

THE QUESTION IS : SHOULD WE EXPECT HYDROGEN EMBRITTLEMENT AND NEED FOR BAKING? The expert assistance will be appreciated.

Hadi Khosravi
- Tehran, Iran


+++

Hadi, if it were my part, I would bake it. 150C, for 4 hours, within 4 hours of plating.

Lee Gearhart
metallurgist
East Aurora, NY


+++

Dear Lee,

Thank u for respond. I received different answers, the most interesting was by Mr. Guffie through his book : Handbook of Hard Chromium Plating.in page 84 as follows: above 35 rockwell baking required for deposit thicker than0.001 inch. In our line I exactly sticking the boarder line 0.001 or 25 micron .That is why I need more experienced answer hoping get rid of baking facility for 3000 shaft per day.

Sorry for late respond,

Hadi Khosravi
- Tehran, Iran


Dear Reader, please --

Answer or follow-up on this subject (in non-commercial fashion).
 
Post a new question or inquiry on a different subject.
 


Legal disclaimer boilerplate button

List of Directories
Jobshops Directory button Environmental Directory button Equipment Directory button Consultants Directory button Chemicals Directory button Test Directory button Help-Wanted Directory button About Advertising button Classifieds Directory button Booklist button

 

Link to Del.icio.us button Save This Page (why?)    -    Home    -    ©1995-2009 finishing.com